Skip to content
SignFlow

Workflow

Custom workflow software: you draw your shop's stages

Every company in SignFlow has its own workflow: on a drawing canvas you decide which stages an order passes through, which team works at each one and how long each should take. Orders move only along the paths you drew.

Why a fixed workflow is not enough

No two sign shops work alike. One has a manager approval after design, another sends the job straight to the foreman; one has separate CNC and paint teams, another does everything in one workshop. A team forced into fixed stages soon goes back to discussing the real status in a chat.

In SignFlow the workflow is your company's own data. You set the stages' names, order, rework paths and which role works where, and the order screens, the board, the lists and the mobile app all follow it.

Stage kinds

KindWhat it does
StandardA plain step one team owns: order entry, manager approval, production chief.
DesignA designer is assigned; the order leaves only through design approval.
Parallel productionSplits the job across chosen departments at once; the responsible one finishes last.
DepartmentOne lane of parallel production: CNC, paint, workshop, electrics and LED.
PackingThe last working stage once production is done.
InstallationFor orders with field installation planned.
PurchasingWhere material requests leave the main flow.

Stages, transitions and roles

A move that is not in the workflow cannot be made from any screen: dragging on the board, bulk moves and the mobile app follow the same rule.

  • Transitions are drawn from one stage card to another. Forward moves advance the order; a rework path back, such as production to design, shows as a dashed line.
  • A transition can be limited to certain order types, and each order type starts at one stage.
  • Roles are attached to each stage. Members in those roles see and work the orders there; a stage without roles is flagged with a warning.
  • When an order reaches parallel production, whoever moves it picks the departments and the responsible department that finishes last. The responsible department cannot close until the others are done and a file of the finished work is on the order; the last task moves the order to packing by itself.

Target hours and sub-statuses

Each stage can have a target in hours, and in parallel production each department has its own. Time is counted in calendar hours. The order's flow view shows how long it spent at each stage and how much time is left or how late it is. While the order waits for the customer's approval, the stage clock stops.

Sub-statuses are finer states inside a stage, such as “At chrome plating” in production. Each stage takes up to 20 options with colours from a fixed palette, and the list filters by them. A removed option is archived: orders carrying it keep showing it until they change, and it can no longer be picked. Options are also edited in the sub-status settings, where one option per stage can be set to apply automatically while the customer's approval is awaited.

Publishing changes safely

Removed stages are archived, so past orders and records still show them by name.

  1. 1

    Work on a draft

    In Settings → Workflow you add stages from the palette on the left and edit them in the panel on the right. Undo and redo work, and nothing affects the team until you publish.

  2. 2

    Check the problem list

    An order type with no starting stage, a stage nothing leads to, or parallel production with no way out are errors that block publishing. Things that would strand orders, such as a stage with no way forward, show as warnings.

  3. 3

    Review the summary

    Before publishing, the changes are listed in plain words. If you removed a stage that still holds orders, you choose here where those orders go.

  4. 4

    Publish

    The workflow is published as a whole. If someone else changed it meanwhile, your draft does not overwrite theirs; you can download your draft as a file and reload the current workflow.

The workflow you start with

When your company account opens, a working workflow is ready: Order entry → Design → Manager approval → Production chief → Production (parallel: CNC, Paint, Workshop, Electrics and LED) → Packing, plus Purchasing and Field installation. Roles are created and attached too, so you can run a first order end to end without opening the editor, then rename stages, departments and paths to fit your shop.

Frequently asked questions

Can I rename stages and change how many there are?

Yes. Add and remove stages, rename them, add departments and redraw transitions. Removing a stage that holds orders asks you where those orders should go.

Who can edit the workflow?

Members with permission to manage the workflow. Members who create and update orders can view it read-only. The editor is built for a computer screen; on a phone the stages and where they lead appear as a list.

Will changing the workflow disrupt orders in progress?

No. Changes are made on a draft and cannot be published while there are errors. Orders at a removed stage move to the stage you chose, and past records keep the old stage's name.

Does every job have to go through design?

No. Order types can start at different stages and take different transitions, so jobs that need no design can go straight to production.

How do I set a target time for a stage?

Select the stage in the editor and enter its target in hours. When an order passes the target, its flow view shows how late it is.

Related pages

Open your next order in SignFlow, not WhatsApp

Free for 7 days. No card required, and the ready-made sign shop workflow gets you going in minutes.