Skip to content
SignFlow

Guide

How to get design approval from a customer, and keep the record

You get design approval by showing the customer the final file with its dimensions, colours, material, mounting and quantity, and having them approve that file explicitly, in a way that leaves a record. If they ask for changes, the new file needs a new approval.

Updated:

Why design approval matters so much

Every change after cutting starts costs material and labour. A misspelt phone number, a blue that is not the one the customer imagined, letters smaller than expected: when this shows up after the job is done, the maker usually pays. To say “you approved this” you need to show which file, at which size, was approved and when.

Getting design approval has two parts: what you show the customer and how you record their answer. If either is missing, the approval is no help when there is a dispute.

What an approval should contain

A nice picture is not enough. The approval sheet or page should show the job exactly as it will be made. A good customer approval form includes:

  • The final artwork and, where possible, a mock-up on the facade
  • Dimensions: overall width and height, letter height, depth for channel letters
  • Colours: codes (RAL, Pantone or vinyl code), with a note that screen colours can differ from print and paint
  • Material: acrylic, aluminium, composite, stainless; illuminated or not, and how
  • Mounting: directly on the wall, on standoffs, on a backing panel; mounting height
  • Quantity, and a list if items go to several branches
  • A note asking the customer to check text, phone number, address and web address
  • The version or date of the approved file, so it is clear which revision was approved

Proofs and revision rounds

  1. 1

    First proof

    Show the draft at real size, ideally on a photo of the facade. Seeing the sign in place settles the size discussion early.

  2. 2

    Collect revisions in one list

    Ask for all changes at once and in writing rather than going five rounds on scattered messages. Stating in the quote how many revisions the price includes makes this conversation easier.

  3. 3

    Version every round

    Name files v1, v2, v3 or by date. The version that was approved is the one that goes to production, not the “final_final” file on someone's desktop.

  4. 4

    Ask for the final approval explicitly

    Ask plainly: “We will produce it exactly like this; do you approve?” A “looks great” or a thumbs-up is not an approval.

Link, chat or phone: which approval holds up?

Whatever the channel, keep the approval with the order. If you got it on the phone, send the customer the approved file in writing right afterwards with a note such as “we are producing this file as you approved on the phone”.

ChannelUpsideDownside
PhoneFast and effortless for the customerNo record; you cannot show later which file was discussed
Chat appCustomers are used to it; file and answer in one placeGets lost in the thread, lives on personal phones, versions get mixed up
EmailWritten and dated, attachments keptIn long threads it is unclear which attachment was approved; not everyone on the team sees it
Approval linkA clear approve / request changes decision on specific files, saved on the order with its dateThe customer has to open the link; it needs a system that creates links

Handling change requests

  • Before approval: prepare a new version and ask for approval again; an old approval does not cover a new file.
  • After approval, before production: stop the job, tell the customer in writing how the change affects time and price, and get the new version approved.
  • After production has started: agree the cost of parts already cut or painted and the new due date; have any extra charge approved too.
  • In every case: tell the team which version is no longer valid so nobody cuts from the old file.

How to keep the approval record

Being able to find an approval months later matters as much as getting it. Complaints about signs often arrive weeks or a year after handover: when a light fails, at a branch opening, or when the customer orders again and says “the colour was different last time”. If the approval sits on an employee's phone, in a former designer's mailbox or in a deleted chat, it is as good as no record.

Keep the approved file, the approval date, the name of the person who approved and the channel it came through with the order, somewhere everyone involved can reach. With a shared folder, name it by order number and keep the approved version in its own subfolder. Giving the person who cuts in the workshop access only to the approved version lowers the risk of producing from an old file.

A record is not a weapon; most of the time it makes the conversation easier. Opening the approved file together is quicker than arguing about who said what, and the same file is ready the next time the job is repeated.

Design approval in SignFlow

In SignFlow the designer picks which of the order's checked files the customer sees and sends an approval link. It goes to the customer email and phone on the order, is valid for seven days and needs no account. The customer sees only those files; approving moves the order to its next stage, and a change request requires a comment that reaches the designer as a notification. While the customer decides, the stage timer and due countdown pause. If the customer approved in person or on the phone, an authorised member approves the design on the order; either way the order's history shows who approved and when.

Frequently asked questions

How long should a customer have to approve a design?

There is no fixed period, but the due date should run from the day approval arrives. Saying so in the quote or the approval message helps: if the customer delays, delivery moves by the same amount. If no answer comes, send a short reminder, and do not start cutting before approval.

What should a customer approval form contain?

The final artwork, dimensions, colour codes, material and lighting, mounting method, quantity, a note asking the customer to check the text, and the date or version number of the approved file.

Is an approval over a chat app good enough?

A written message is a better record than a phone call, but in a chat it can be unclear which file was approved, and messages stay on personal phones. Keep the approved file and the approval date with the order as well. For legal questions, ask a lawyer.

What if the customer asks for changes after approving?

Tell them in writing how the change affects time and price, prepare a new version and get it approved again. If production has started, agree the cost of work already done and tell the team the old file is no longer valid.

How many revision rounds should be free?

There is no fixed answer; it depends on the job and your price. What matters is stating the included revisions in the quote and how extra rounds are charged.

Related pages

Open your next order in SignFlow, not WhatsApp

Free for 7 days. No card required, and the ready-made sign shop workflow gets you going in minutes.