Furniture production tracking: one flow from order to installation

A furniture order passes through several departments between panel cutting and assembly, and often ends with installation in the customer's home. SignFlow keeps that path on one order, from drawing approval to the installation photo, and shows each department only its own turn.

How a furniture order moves through the workshop

A wardrobe, kitchen or sofa order starts with measurements. The drawing is made, the customer and a manager approve it, and the production chief sends it to the floor. Panels are cut to size, edges are banded, holes are drilled on the CNC, lacquered or varnished parts go to finishing, upholstered pieces are prepared with fabric and foam, and finally everything is assembled in the workshop. Then it is packed, shipped and, where needed, installed on site.

The usual problem in workshop order tracking is losing the sequence: the finisher hears by phone that CNC is done, assembly finds a missing part on installation day, and which drawing was approved lives in a chat group. Furniture manufacturing tracking needs one order everybody looks at, with each department seeing by itself when its turn comes.

Your account opens with a furniture workflow

Sign-up asks for your industry; choose furniture and the account opens with its ready workflow: Order entry, Design / Drawing, Manager approval, Production chief, Production, Packing, Shipping and installation. The production chief can send an order to Purchasing when material is missing and take it back.

Roles are ready too: Manager, Designer, Production chief, one role per department, Packing, Warehouse, Purchasing and the Shipping and installation crew. You can change the stages, departments, roles and which role works at which stage in the workflow editor.

Departments work in the right order

The Production stage is a sub-flow of its own. In the default setup Panel cutting comes first; Edge banding and CNC / Drilling start after cutting, and Finishing comes after CNC. Upholstery starts at once, since fabric and foam do not wait for panels. Workshop assembly starts when all the others are done.

  1. 1

    The production chief picks the departments

    As the order enters production you choose which departments it visits. A department whose turn has not come can be started at once for that order alone with “Start without waiting”.

  2. 2

    A waiting department shows as “Up next”

    A task whose predecessors are not finished shows as “Up next” to its team, and its clock does not run. When they finish, the task starts by itself and the team is notified.

  3. 3

    Departments not chosen are not waited for

    An order without paint goes from CNC straight to assembly; nobody waits for a department this order does not visit.

  4. 4

    The responsible department closes last

    Each team closes its own task on the web or in the iOS and Android app. The responsible department closes last and adds a new file, such as a photo of the finished piece; when the last task closes, the order moves to packing.

Sizes and materials live in the template

You define a template per product, with a photo gallery, its own fields, defaults and help text. A furniture account starts with Width, Height and Depth (mm), Body material (particleboard, MDF, solid wood, plywood), Surface (melamine, lacquer, acrylic, veneer), Fabric, Colour and Legs / handles.

An order starts from a template and is not saved until the required fields are filled. What reaches cutting, finishing and upholstery sits in the same place and the same shape on every order, instead of on a scrap of paper.

Drawing approval from the customer, no account needed

From the Design / Drawing stage you can send the customer an approval link by email and SMS. They see the drawing, approve it or ask for changes without an account, and the decision is written to the order's history. While the customer decides, the stage clock and the due countdown pause, so days the customer took do not look like workshop delays.

Panels, fabric, hardware: needs known up front

When you enter what an order needs, it is compared with stock: what the warehouse can cover becomes a material request, the shortfall a purchase request. A goods receipt updates the stock itself.

The default material classes are particleboard / MDF, solid wood, edge banding, fabric, foam, hardware / accessories, paint and varnish, and packaging. Units include piece, set, metre, square metre, sheet and roll; centimetres convert to metres, and you set how many square metres a sheet holds.

Delivery and installation

  • Plan a delivery or installation with a date, address, contact person and crew; see it on a week or month calendar with a row per crew.
  • The crew sees the day's jobs in the mobile app, calls the customer and opens directions.
  • An installation cannot be closed without a date and a photo, and an order that needs one stays open until it is done.

See delays per department

Each stage can carry a target time in hours and your own sub-statuses, such as “Waiting for fabric” or “Revision”. The order's flow view shows how long it stayed at each stage and how far past its target it went.

The dashboard's sub-flow timing card shows, per department, how many tasks finished on time and how many late, the average and longest delay, and what is late right now. Due dates are Istanbul calendar days: an order is overdue only once its due day has ended.

Frequently asked questions

Does every furniture order have to visit every department?

No. As the order enters production the production chief picks the departments it needs. A department that is not chosen is not waited for; an unpainted job goes from CNC straight to assembly.

Can a department skip its turn on a single order?

Yes. When moving the order into production, the production chief can start a department whose turn has not come at once for that order with “Start without waiting”. The general sequence is changed in the workflow editor, and publishing it applies it to open orders too.

Our workshop has different departments. Can I change the default workflow?

Yes. The default workflow is only a starting point; in the workflow editor you can add, remove and rename stages and departments and bind roles to them.

Can the people on the shop floor use it?

Yes. Each department sees its own queue on the web or in the iOS and Android app and closes its own task; when its turn comes, a notification arrives in the app, by email and as a push.

Does everyone see the prices?

No. A quote can be prepared with lines and VAT and converted into an order, but only users with the pricing permission see the amounts. The shop floor sees the order without prices.

Related pages

Production tracking

Production tracking: where every work order is, who has it and for how long

In SignFlow every order moves through your workshop's own stages. CNC, paint and electrics on a channel letter, panel cutting, edge banding and CNC on a wardrobe, springs, foam and fabric on a mattress: each department works its part, and the board shows where each job waits, how long it has been there and how far it is from its due date.

Read more

Workflow

Custom workflow software: you draw your workshop's stages

Every company in SignFlow has its own workflow: on a drawing canvas you decide which stages an order passes through, which team works at each one and how long each should take. Orders move only along the paths you drew.

Read more

Stock and purchasing

Stock tracking for manufacturers: materials, depots and purchasing next to the order

In SignFlow every material coming in or going out is recorded as a stock movement, and stock never goes below zero. An order's material needs are checked against what is on the shelf: what is there is requested from the depot, the shortfall becomes a purchase request.

Read more

Installation tracking

Installation and delivery tracking: field crews see their jobs on the phone and close them with a photo

In SignFlow every installation, on-site assembly or delivery is its own record tied to an order: the date, the address, who to call on site and the crew going out. Planners run it from a calendar, crews see their own jobs on their phone, and a job closes only with a photo.

Read more