How a mattress order moves through production
A mattress order arrives with a size, a spring type, a firmness and a fabric. A manager approves it and the production chief sends it to the floor. The spring unit is prepared, foam is cut, fabric is cut and quilted, the border is sewn, and finally the mattress is closed, packed and shipped.
When orders from dealers, stores and direct customers pile up in the same week, the problem is usually information: a custom size sits on a sticky note, closing has to ask whose border is finished, and an empty fabric roll is noticed only at the cutting table. Mattress order tracking needs one order everybody looks at, with each department seeing its turn by itself.
Your account opens with a mattress workflow
Sign-up asks for your industry; choose mattresses and the account opens with its ready workflow: Order entry, Manager approval, Production chief, Production, Packing, Shipping. The production chief can send an order to Purchasing when material is missing and take it back.
Since sizes are mostly standard, the default workflow has no design stage. If you make custom pieces, add a design stage in the workflow editor and change the stages, departments and roles to match your plant.
Springs, foam and fabric together; closing last
The Production stage is a sub-flow of its own. In the default setup Spring unit, Foam cutting, and Fabric cutting and quilting start together. Border sewing follows quilting, and Closing / assembly starts when all the others are done.
- 1
The production chief picks the departments
As the order enters production you choose which departments it visits; a department whose turn has not come can be started at once for that order alone with “Start without waiting”.
- 2
A waiting department shows as “Up next”
A task whose predecessors are not finished shows as “Up next” to its team, and its clock does not run. When they finish, the task starts by itself and the team is notified.
- 3
Departments not chosen are not waited for
A springless mattress skips the spring unit; closing waits only for the departments this order actually visits.
- 4
The responsible department closes last
Each team closes its own task on the web or in the iOS and Android app. The responsible department closes last and adds a new file, such as a photo of the finished mattress; when the last task closes, the order moves to packing.
Size and firmness live in the template
You define a product template per model, with a photo gallery, its own fields, defaults and help text. A mattress account starts with Size (standard sizes from 80×190 to 180×200, plus Custom), Custom width / length (cm), Height (cm), Spring type (Bonnell, pocket spring, springless), Firmness (soft, medium, firm), Sides (one or two) and Fabric.
An order starts from a template and is not saved until the required fields are filled. The custom size, firmness and sides sit in the same place on every order, so the cutting table does not have to phone anyone.
Springs, foam, fabric: needs known up front
When you enter what an order needs, it is compared with stock: what the warehouse can cover becomes a material request, the shortfall a purchase request. A goods receipt updates the stock itself.
The default material classes are springs, foam / visco, fabric, fibre / wadding, zips and tape, and packaging. Units include piece, metre, square metre, kilogram, roll and bolt; centimetres convert to metres.
Shipping plan and delivery
- Plan a delivery with a date, address, contact person and crew; see it on a week or month calendar with a row per crew.
- The crew sees the day's jobs in the mobile app, calls the customer and opens directions.
- A delivery cannot be closed without a date and a photo, and an order that needs field work stays open until it is done.
Which department is running late?
Each stage can carry a target time in hours and your own sub-statuses, such as “Waiting for fabric” or “Dealer confirmation”. The order's flow view shows how long it stayed at each stage and how far past its target it went.
The dashboard's sub-flow timing card shows, per department, how many tasks finished on time and how many late, the average and longest delay, and what is late right now. Due dates are Istanbul calendar days: an order is overdue only once its due day has ended.